06-Tuberculosis Control Institute sewage treatment project in Fangshan District, Beijingupp

Tuberculosis Control Institute sewage treatment project in Fangshan District, Beijing

Project process: A/O + MBR + sodium disinfection + ozone disinfection
Completion time: March 2020
Project introduction: The daily treatment scale is 50 m3/d. The effluent requirements meet the local medical institution water pollutant discharge standards.