Leave Your Message
3

Upgrading and Reconstruction Project of Village-Level Sewage Treatment Station in Huairou District of Beijing In 2017

Process: The company independently develops the PWT-A Packaged Sewage Treatment Plant (AO + MBR) + activated carbon filtration.
Completion time: October 2019
Project introduction: The project is located in Huairou District, Beijing. A total of 13 sewage treatment stations have been constructed, with a total designed treatment water volume of 1680 cubic meters per day. Fourteen sets of the PWT-A series of integrated equipment independently developed by the company have been adopted. The effluent complies with the local discharge standards, mainly solving the problem of domestic sewage discharge from seven villages within the Huai Sha River Basin.

about us